I’m living in East Europe and I got the warning like a week ago.
I feel like people are ignoring huge parts of information in this.
Why not move it out first? -they can’t. Litterally one of the first things they normally do. It has degraded too much and has become unstable.
Why not only do small explosions instead if the whole thing at once? -again, they can’t. They can’t move it it all.
Why blow it up at all? -because it is unstable and has a chance to blow up on its own, uncontrolled and at an unknown time.
Why can’t they do anything to mitigate the lead? -they are. They have over 2ft of concrete surrounding it, and have close to two stories of sandbags covering it. And they are going to water down all the soil around it to prevent as much dust as possible, and run water on the explosion when they detonate it.
What is the EPA doing about this? -the Army has worked with the EPA to make the mitigation plan and minimize environmental impacts. They also took aver 130 soil samples from homes and land around the base to monitor lead levels and will be testing random sites after the explosion at randomized intervals. They also worked with the EPA on planning the date to coincide with wind and weather patterns to minimize where the cloud will drift over populated areas.
Why didn’t the Army warn the local? -the did. There were even small, uninformed protests of people refusing to understand the situation and insist they could just ignore it and not blow it up. The army even worked with the city to shut down schools for the day and warn businesses to close for the day, and issued a warning to stay indoors or even voluntarily evacuate for the weekend for the dust to settle.
The dumbest part in all of this is the new court order to delay it after all the planning for this specific date. This ammo is getting blown in place whether people want it to or not. The only question is when and on whose terms: the people planning it, or the unstable nature of it. People act like the army doesn’t care about the environment, but then anyone who served can tell you that we would get environmental impact breifing before anything we would do and would always do what we could to mitigate impacts. There are huge military regulation on environmental impacts. Private corporations get away with ecocide and most of the time get away with it. In the military they will end people’s careers for touching a protected birds nest.
Valid, but:
were given just a month’s notice
But the dust plume’s potential 100-mile path extends far beyond Middletown, and the other communities in its path —as well as Iowa’s governor—only became aware of the plan on Monday, after the Army made a public announcement
This invalidates everything. With proper notice crop planning can occur, people, even low income, can prepare. This has been brewing for years, and if it was your home, you would feel different.
“Hose down your stuff” is ridiculous.
You are again, ignoring the imminent issue just like everyone else- the material is unstable and can blow on its own at any time. The fact that they are getting more than 24 hours notice is already more than anyone can truly ask for. Planning??? You can’t plan for unstable explosives that will explode on their own any day. They have literally already jumped into quick reaction mode and are doing what they can. Do you really think this was intentional? Have you ever spent a day in the military? I am willing to bet people are going to lose rank over this reaching this level. And as far as the “hose it down” thing, do you have a secret de-leading machine? Do you have a better solution that can feasibly and realistically take place right now that the EPA and Army core of engineers don’t know about? Or is this just one of those keyboard warrior comments that demands people to “do stuff” but can’t articulate what the “stuff” is?
No, we are not.
The Department of Defense had “concerns” about the deterioration of an Iowa-based lead azide stockpile as early as 2004
Two. Thousand. And. Four. Pretty sire 24 hours notice is simply irresponsible.
You can’t plan for unstable explosives that will explode on their own any day.
Yes, you deal with it before it gets to that point

To be fair, the military has never given a shit about how it disposes of its hazardous waste. I remember lawsuits about people getting sick from their burn pits in the 90’s.
90s? Burn pits were still going into the 2010s.
That’s as far back as I remember it, but I never said it stopped.
US army tested agent Orange in Canada in the 60s. No one was warned. US army was told nuclear testing would be safer on the east coast, so prevailing winds would blow fallout to the ocean. Nahhh.
deleted by creator
Totally. It’s right there in the article. Like the Governor of Iowa, who found out about it way back on (checks notes)… Monday.
But the dust plume’s potential 100-mile path extends far beyond Middletown, and the other communities in its path —as well as Iowa’s governor—only became aware of the plan on Monday.
“The good thing is, if people have concerns about it being on their property, all they have to do is hose that off, and it’s gone,” said Army spokesperson Justine Barati.
Just hose off those lungs.
Just hose it off, it’ll contaminate the soil and whenever the sun dries up said soil from a rainfall, it’ll be vapor and the vapor will be purified. Somehow.
all they have to do is hose that off, and it’s gone,” said Army spokesperson Justine Barati.
This sounds like someone that thinks you can flush anything down the toilet because it just disappears, instead of becoming someone else’s problem.
Cancer? Walk it off!
The solution to pollution is just hose it off!
Just hose off the lead contamination that’s penetrating your soil and waterways! Easy.
It “forgot” - sure. I’m sure it wasn’t just not telling people to avoid any NIMBY push back. 🙄
Good news is they got pushback anyway and they’ve at least paused it for now
It’s a fucked situation where this will 100% explode and it is too volatile to move. Years of neglect led to this.
I don’t see why they can’t build some kind of structure around it designed to contain the blast. Just going far enough away that the construction doesn’t trigger anything. Other than that at least wait for a rainy day so the rain pushes the particles back down limiting spread
If the blast is big enough to spread lead contaminants in a 100 mile radius, any structure you build around it is probably just gonna turn into shrapnel instead of containing anything, I would imagine
It would probably need to be earth based and likely would only limit the impacts
Also the blast itself isn’t moving the material that far, it pushes tiny particles into the atmosphere that’s then carried by the wind. Reducing the height of the explosion in any way reduces the spread
Ah that’s fair, thanks for the correction.







