You must log in or register to comment.
The expressway runs from Tianbao Port in Malipo county of the Wenshan Zhuang and Miao Autonomous Prefecture in Yunnan to a connecting road at the Malipo South Interchange, spanning approximately 51.4 kilometers, CCTV News reported.
Traversing geologically complex mountainous terrain with a maximum elevation difference exceeding 1,000 meters, the project features 27 bridges and 17 tunnels, which account for 80.4 percent of its total length. Construction took nearly three years, according to the report.
51 km, 27 bridges, 17 tunnels; 80% of it being bridges & tunnels; under three years. It would have taken decades in the US.
It takes three years just to repair a couple miles of highway in the US




